Join thousands of businesses already trading on AraBazaar, free forever. No commissions, no middlemen.
This dual-layer epoxy anti-corrosion powder coating system is formulated with specialized epoxy resins and functional curing agents. The base layer provid…
Seller: Standard International Group (HK) Limited
Price: 2950.00 USD

PER TON
§ BULK ORDER
Competitive pricing · Dedicated account manager · Flexible delivery
This dual-layer epoxy anti-corrosion powder coating system is formulated with specialized epoxy resins and functional curing agents. The base layer provides corrosion protection, while the outer layer adds a further protective barrier and improves surface durability. Compared with a three-layer polyethylene (PE) coating structure, this system may offer a lower overall anti-corrosion cost, depending on project conditions. Applications Designed for steel pipelines operating in demanding corrosion environments, particularly pipelines crossing mountainous terrain, rivers, and hilly areas. Send Inquiry by Email Product Features Interlayer AdhesionStrong adhesion between the substrate and epoxy coating layers. The dual-layer system bonds firmly to steel and between layers, preventing delamination under long-term burial and thermal cycling.Corrosion ProtectionResistance to permeation and corrosion, with a high degree of cure. The dense cross-linked network blocks moisture and ions from reaching the steel surface, extending pipeline service life in corrosive soil conditions. Surface DurabilityA hard, dense outer layer with scratch resistance and resistance to plant-root penetration. The outer layer stands up to backfill, rock damage and vegetation growth during pipeline installation and long-term burial.Mechanical PerformanceDesigned for high-temperature cathodic disbondment resistance and mechanical durability. Performs well under impressed current cathodic protection and extreme temperature fluctuations. Request a Free Sample Powder Coating Performance Powder Performance Parameters Test Item Technical Specification Test Method / Remarks Appearance Uniform color, no lumps Visual inspection Particle Size Distribution Residuals ≤ 4.0 at 150 μm; ≤ 0.2 at 250 μm Q/CNPC 38-2002, Appendix C Volatile Content (%) ≤ 0.6 Q/CNPC 38-2002, Appendix B Gellation Time at 205 ± 3°C (s) ≥ 12 Q/CNPC 38-2002, Appendix A Curing Time at 230°C (min) ≤ 3 SY/T 0315-2005 Magnetic Substance Content (%) ≤ 0.002 GB/T 6570 Request Technical Datasheet Cured Coating Performance Parameters Test Item Technical Specification Test Method / Remarks Appearance Smooth, uniform color, no bubbles or cracks; slight orange peel permitted Visual inspection Adhesion (Grade) 1–2 SY/T 0315-2005 Cathodic Disbondment at 24 h (mm) ≤ 6.5 SY/T 0315-2005 Cathodic Disbondment at 28 d (mm) ≤ 8 SY/T 0315-2005 Cross-Sectional Crack Rate 1–4 SY/T 0315-2005 Coating Surface Porosity Rate 1–4 SY/T 0315-2005 Bending Resistance (3°) No cracks SY/T 0315-2005 Volume Resistivity ≤ 1 × 10¹³ GB/T 1410 Electric Strength (MV/m) ≥ 30 GB/T 1408.1 Impact Resistance (1.5 J at −30°C) No leakage points SY/T 0315-2005 Chemical Resistance Qualified SY/T 0315-2005 Wear Resistance (Abrasion Method) ≤ 3 SY/T 0315-2005 Salt Spray Test (1,000 h) No visible coating change GB/T 1771-1991 Discuss Your Pipeline Project Execution Standard Q/CNPC 38-2002 — Technical Specification for Double Layer Fusion Bonded Epoxy Powder Coating on Steel Pipes Curing Conditions Property Specification Remarks Temperature and Time 200–230°C for 3–1.5 minutes Medium-frequency heating recommended Application Parameters Parameter Specification Notes Applicable Equipment Tribostatic spray or corona electrostatic spray Select equipment according to the application process Film Thickness 250–500 μm Adjust according to workpiece requirements Request Application Parameters Storage and Packaging Storage ConditionsStore in a dry environment below 30°C. Keep away from moisture, direct sunlight and heat sources to preserve powder flow and cure performance.Storage PeriodShelf life is 6 months under the specified storage conditions. Use within the recommended period for best electrostatic spray performance and film consistency.Packaging20 kg paper cartons lined with plastic bags. Reseal opened packaging immediately to limit moisture absorption and prevent powder caking.